Power supply from the public grid and process steam via boiler system

Michelin tire plants, Bad Kreuznach, Germany
Goal
Energy-efficient supply of steam and electricity to the tire plants
Solution
Operational management by Iqony, renewal of energy generation
- Gas turbine with 10 MWel and waste heat boiler
- Takeover of the operating team
Results
- Investment: € 10 million
- Savings: 1 million €/a
- CO2 savings: 7.000 t/a
Impact
Energy saving, cost reduction, Integration of the old system
Project facts
Generation | |
Electricity | 72,000 MWh/a |
Steam | 167,000 MWh/a |