References
Replacement of the existing systems

BP refinery, Gelsenkirchen-Scholven, Germany
Goal
Fuel switch from coal to gas and reduction of CO2 emissions
Solution
Construction and maintenance of 4 new high-pressure steam boilers and the 3-line water and condensate treatment system
- Optimized life cycle cost
Results
CO2 savings: approx. 180,000 t/a
Impact
Increasing efficiency, cutting costs, reducing CO2 emissions
Project facts
Steam generation | 2 x 140 t/h 2 x 120 t/h |
Water treatment | 3 x 220 m3/h |
Condensate treatment | 3 x 300 m3/h |