    Replacement of the existing systems

    BP refinery, Gelsenkirchen-Scholven, Germany

    Goal

    Fuel switch from coal to gas and reduction of CO2 emissions

    Solution

    Construction and maintenance of 4 new high-pressure steam boilers and the 3-line water and condensate treatment system

    • Optimized life cycle cost

    Results

    CO2 savings: approx. 180,000 t/a

    Impact

    Increasing efficiency, cutting costs, reducing CO2 emissions

    Project facts

    Steam generation 2 x 140 t/h
    2 x 120 t/h
    Water treatment 3 x 220 m3/h
    Condensate treatment 3 x 300 m3/h