References
Owner's engineer in sewage sludge incineration plant
Sewage Sludge Incineration Plant Bottrop, Germany – Owner's Engineer
The Emschergenossenschaft operates a sewage sludge incineration plant at the Bottrop site which will be equipped with a new steam turbine and whose boiler and flue gas cleaning system will be renewed.
Iqony Solutions (IQS) is providing the following services as Owner’s Engineer for a lot-by-lot execution (6 lots) in the existing plant, planning and construction management during ongoing operation:
- Concept study, plant concept, design planning, cost estimation
- Layout planning, 3D model
- Approval planning and management
- Procurement planning and procurement
- Planning control of detail engineering
- Construction supervision, technical site management, commissioning management
Project facts
Combustion capacity | 2 x 10 MWth |
Plant capacity | 8,25 t/h conditioned sewage sludge |
Emission limit values | According to 17. BImSchV |
Generator | 3,2 MWel |
Customer | Emschergenossenschaft |
SES performance period | 2015 – 2020 |