Iqony as general contractor at refinery site
BP STEAM at Refinery Gelsenkirchen-Scholven, Germany – General Contractor
Ruhr Oel GmbH (ROG) planned a total of 4 new high-pressure steam boilers with a maximum firing heat capacity of 436 MWth at the Gelsenkirchen-Scholven site, with two plants in construction at Field North and two at Field Centre.
Iqony has been commissioned by ROG as General Contractor (EPC) for the planning, construction, commissioning and subsequent maintenance.
Iqony Solutions (IQS) was responsible for the technical processing providing the following services:
- General planning
- Detail design
- Technical control of subcontractors
- Site management/construction supervision
- Commissioning management
Project facts
Installed capacity | 2 x 140 t/h (2 x 122 MWth) 2 x 120 t/h (2 x 96 MWth/15 MWel) |
Technology | Natural circulation boiler |
Fuel | Natural gas/coke gas/refinery gas |
Customer | Iqony GmbH/Ruhr Oel GmbH |
IQS performance period | 2017 – ongoing |