• EN
  • References

    Iqony as general contractor at refinery site

    BP STEAM at Refinery Gelsenkirchen-Scholven, Germany – General Contractor

    Ruhr Oel GmbH (ROG) planned a total of 4 new high-pressure steam boilers with a maximum firing heat capacity of 436 MWth at the Gelsenkirchen-Scholven site, with two plants in construction at Field North and two at Field Centre.

    Iqony has been commissioned by ROG as General Contractor (EPC) for the planning, construction, commissioning and subsequent maintenance.

    Iqony Solutions (IQS) was responsible for the technical processing providing the following services:

    • General planning
    • Detail design
    • Technical control of subcontractors
    • Site management/construction supervision
    • Commissioning management

    Project facts

    Installed capacity 2 x 140 t/h (2 x 122 MWth)
    2 x 120 t/h (2 x 96 MWth/15 MWel)
    Technology Natural circulation boiler
    Fuel Natural gas/coke gas/refinery gas
    Customer Iqony GmbH/Ruhr Oel GmbH
    IQS performance period 2017 – ongoing