    Owner's engineer at combined cycle power plant

    CCPP Herne, Germany – Owner's Engineer

    CCPP Herne – efficiency of up to 61% @ 650 MW

    GuD Herne GmbH intended to build and operate a new gas-fired Combined Cycle Power Plant (CCPP) with an approximate electrical net output of 650 MWel in condensing mode and district heat extraction of up to 450 MWth on the site of the existing Herne CHP plant.

    Iqony Solutions (IQS) executed the following services as Owner’s Engineer:

    • Conceptual Design
    • Basic Engineering
    • Project Management
    • Permission documentation
    • Preparation of tender documents
    • Design Review
    • Supervision of quality assurance and expediting
    • Construction site management and supervision of commissioning
    • Site supervision

    Project facts

    Installed capacity max. 650 MWel/max. 450 MWth
    Technology Siemens H-class
    Fuel Natural gas
    Customer GuD Herne GmbH
    IQS performance period 2017 – 2022