References
Process quality optimization with SR::EPOS, SR::SPC and SR::EAGLE
Combined Cycle Power Plant North Bangkok 2, Thailand – Process Quality Optimization with SR::EPOS, SR::SPC and SR::EAGLE
The plant consists of two single-shaft units, each with a gas turbine and a heat recovery steam generator.
Iqony Solutions (IQS) has commissioned a process quality monitoring system (SR::EPOS) including validation according to VDI2048 to optimize the plant. Furthermore, a system for the support of predictive maintenance (SR::SPC) was implemented. SR::EAGLE was installed for an extended evaluation of the results of the aforementioned systems including troubleshooting.
An intensive training program enabled the customer to put further systems into operation.
Project facts
Installed capacity | 2 x 400 MW |
Implemented IT solutions | SR::EPOS, SR::SPC, SR::EAGLE |
Customer | Electricity Generating Authority of Thailand (EGAT) |
IQS performance period | 2015 - 2018 |