    BP STEAM at the refinery site Gelsenkirchen-Scholven, Germany – General contractor and maintenance

    Iqony was hired by ROG as EPC for the planning, construction, commissioning and subsequent maintenance of 4 new high-pressure steam boilers with a total maximum rated thermal output of 436 MWth.

    After completion of the high-pressure steam boilers, Iqony Solutions is responsible as a subcontractor for the maintenance measures for all four boilers, including all ancillary systems for a period of 5 years from the commissioning of the last boiler.

    IQS provides the following services:

    • Scheduled and unscheduled maintenance
    • Delivery of spare and wear parts
    • Consumables
    • Warehouse responsibility
    • Evaluation of operating data for preventive maintenance

    Project facts

    Installed capacity 2 x 140 t/h (2 x 122 MWth)
    2 x 120 t/h (2 x 96 MWth / 15 MWel)
    Technology Natural circulation boiler
    Fuel Natural gas / coke gas / refinary gas
    Customer Iqony GmbH / Ruhr Oel GmbH
    IQS performance period 5 years