• EN
  • References

    BEW transformation plan and engineering

    Large-scale 20 MWth heat pump for Erlanger Stadtwerke AG – BEW transformation plan and engineering

    Iqony Solutions is compiling a transformation study and is also designing a new large-scale heat pump based on river water.

    Project details:

    • Transformation study according to BEW (Federal Funding for Efficient Heating Networks) requirements
    • River water source heat pump rated at 20 MWth
    • CAPEX > 20,000,000 euros
    • River water connection, district heating connections
    • New build, greenfield site

    Project facts

    Technical data  
    • Inner-city district heating network
    • 20 MWth heat pump
    • Maximum load approx. 120 MWth
     
    Type of study BEW study to AGFW requirements, district heating network
    Voltage level Medium voltage
    HOAI phases Preliminary design for heat pump
    Client Erlanger Stadtwerke AG
    IQS performance period 10/2023 to 03/2024