References
BEW transformation plan and engineering
Large-scale 20 MWth heat pump for Erlanger Stadtwerke AG – BEW transformation plan and engineering
Iqony Solutions is compiling a transformation study and is also designing a new large-scale heat pump based on river water.
Project details:
- Transformation study according to BEW (Federal Funding for Efficient Heating Networks) requirements
- River water source heat pump rated at 20 MWth
- CAPEX > 20,000,000 euros
- River water connection, district heating connections
- New build, greenfield site
Project facts
Technical data |
|
Type of study | BEW study to AGFW requirements, district heating network |
Voltage level | Medium voltage |
HOAI phases | Preliminary design for heat pump |
Client | Erlanger Stadtwerke AG |
IQS performance period | 10/2023 to 03/2024 |