    Study for securing the steam supply of a refinery site

    Leuna Refinery Power Plant, Germany – Concept Study

    Study for ensuring the steam supply of the Leuna refinery site

    Task:

    • The basis was a previous study on different implementation variants for the electricity and steam supply
    • Preferred variants were elaborated and assessed from a technical as well as commercial point of view
    • Analysis of the new construction with seven boiler systems
    • Refitting of the existing plants for natural gas was analyzed
    • Objective: saving CO2 emissions

    Project facts

    Boiler systems • 4 water tube boilers
    • 3 large-scale water tube boilers
    Steam lines • HD-Dampf: 39 bar / 370 °C / max. 120 t/h
    • MD-Dampf: 18 bar / 260 °C / max. 80 t/h
    • ND-Dampf: 6 bar / 180 °C / max. 60 t/h
    Future fuel Natural gas
    Customer Iqony GmbH / Total Raffinerie Mitteldeutschland
    IQS performance period 06/2020 – 12/2020