Study for securing the steam supply of a refinery site

Leuna Refinery Power Plant, Germany – Concept Study
Study for ensuring the steam supply of the Leuna refinery site
Task:
- The basis was a previous study on different implementation variants for the electricity and steam supply
- Preferred variants were elaborated and assessed from a technical as well as commercial point of view
- Analysis of the new construction with seven boiler systems
- Refitting of the existing plants for natural gas was analyzed
- Objective: saving CO2 emissions
Project facts
Boiler systems | • 4 water tube boilers • 3 large-scale water tube boilers |
Steam lines | • HD-Dampf: 39 bar / 370 °C / max. 120 t/h • MD-Dampf: 18 bar / 260 °C / max. 80 t/h • ND-Dampf: 6 bar / 180 °C / max. 60 t/h |
Future fuel | Natural gas |
Customer | Iqony GmbH / Total Raffinerie Mitteldeutschland |
IQS performance period | 06/2020 – 12/2020 |